Black Marlin Pipeline
Available Capacity Report



Effective Date: 04-01-2024 9:00:00 AM Scheduling Cycle: INTRADAY 3
End Date: 04-02-2024 8:59:59 AM Posting Date: 04-01-2024 21:39:52
Location Location Name Location
Purpose
Flow
Indicator
All Qty
Avail
Design
Capacity
(MMBtud)
Operating
Capacity
(MMBtud)*
Total
Scheduled
Quantity
Operationally
Available
Capacity
IT
Desc
Comments
HPL BK Marlin to HPL MQ DELIVERY 150,000 150,000 0 150,000 N
Tejas BK Marlin to Tejas/KM MQ DELIVERY 120,000 120,000 0 120,000 N
UnCarb BK Marlin to Union Carbide MQ DELIVERY 150,000 150,000 0 150,000 N
BKMarlin Black Marlin Mainline M2 RECEIPT 160,000 160,000 0 160,000 N
All stated volumes are in MMBTU.
All posted times are CST.